1
/
of
6
Keepro
Keepro Hybrid Air Hose, Flexible 3/8 Inch ID x 10 Feet Long Lead-in Short Air Compressor Hose with Swivel Solid Brass 1/4" Industrail Quick Coupler and Plug, 300 PSI Maximum Pressure, Red
Keepro Hybrid Air Hose, Flexible 3/8 Inch ID x 10 Feet Long Lead-in Short Air Compressor Hose with Swivel Solid Brass 1/4" Industrail Quick Coupler and Plug, 300 PSI Maximum Pressure, Red
Regular price
$39.95 USD
Regular price
$79.99 USD
Sale price
$39.95 USD
Unit price
/
per
Tax included.
Shipping calculated at checkout.
Couldn't load pickup availability
Brand: Keepro
Color: Red
Features:
- SPECIFICATIONS: Heavy-duty 3/8-inch ID hybrid air hose designed for professional use with a maximum pressure rating of 300 PSI
- DURABILITY: Flexible red rubber and pvc construction resists kinking, coiling, and weather damage while maintaining excellent flexibility at -40 to 150 degree F.
- CONNECTIONS: Features SWIVEL brass fittings on both ends with sturdy strain relief grips for secure attachment to air tools and compressors.
- VERSATILITY: Perfect for use with nail guns, impact wrenches, spray guns, and other pneumatic tools requiring consistent air pressure
- DESIGN: High-visibility red color enhances workplace safety and makes the hose easy to locate on job sites
model number: H102007
Part Number: H102007
Package Dimensions: 8.0 x 7.5 x 2.2 inches
Share
